Pedra do Reino III

Power: 
18 MW
Status: 
01 In operation 11

Pedra do Reino III is one of four projects carried out by Elawan that started operating by 2012 in Brazil. It is located in Sobradinho in the Bahía region, and the turbines being used for this project are the Vestas V82.

Multimedia