News

Elawan publishes its fifth Sustainability Report corresponding the exercise 2017

Date: 
06/Sep/2018
Category: 
Corporacion Gestamp, Gestamp Renewables, Gestamp Wind

Madrid, September 6, 2018.- Elawan presents its fifth Sustainability Report corresponding the exercise 2017, aiming to presents to its stakeholders all its financial, environmental and social results in a balanced and transparent way.

This new Report has been developed in line with the directives defined by the new Global Reporting Initiative (GRI) and as a result of the Materiality Study.

The financial...

Elawan signs a 102 MW wind project in South Africa

Date: 
06/Apr/2018
Category: 
Corporacion Gestamp, Gestamp Renewables, Gestamp Wind

Madrid, April 6, 2018.- Elawan Energy has signed 102 megawatts (MW) energy power purchase agreement (PPA), arising from the round 4 of the South African Power Plan tender.

Copperton wind farm, promoted by Elawan Energy as majority partner it is along with its local associates, is located in Northern Cape province, South Africa, and will represent an investment of over 145 million euros, with an estimated annual production of 360 GWh/year. The 20 years durable energy sales contract forecasts an income of over 400 million euros.

Construction works for this new...

Gestamp Wind will reach the goal of 900 wind power MW in 2016

Date: 
06/Jun/2016
Category: 
Corporacion Gestamp, Gestamp Renewables, Gestamp Wind

  • In 2015, Gestamp Wind put in operation several wind power projects in Belgium, Brazil, Poland, and Turkey, thus adding 168 megawatts to its wind power portfolio.

 

  • Thanks to its 29 operating wind farms, Gestamp Wind helped lower C02 emissions by 504,923 tons.

 

  • Gestamp Wind is currently building projects in Belgium, Brazil, Mexico, and Turkey, surpassing one gigawatt of power in 2017.

 

Madrid 6th...

Gestamp Wind puts 152 megawatts into operation

Date: 
13/Jan/2016
Category: 
Corporacion Gestamp, Gestamp Renewables, Gestamp Wind

  • Gestamp Wind has set into operation 7 new wind farms in Belgium, Poland and Brazil  with a total investment of 170 million euros.
  • Gestamp Wind is currently building 216 MW in Turkey, Belgium and Brazil, all of which will be operational before September 2016.

 

Madrid, 13th of January of 2016. During the past month of December, Gestamp Wind has set into operation seven new wind farms, with a combined power of 152 megawatts (MW). These wind farms are located in Belgium, Poland and...

Gestamp Wind opens its second wind farm in Turkey

Date: 
14/Oct/2015
Category: 
Corporacion Gestamp, Gestamp Renewables, Gestamp Wind

Madrid, 14th of October of 2015. Gestamp Wind, the wind energy division from Gestamp Renewables, has opened the second wind farm in Adares, Turkey, with a power of 10 megawatts (MWs).

The wind farm has 5 aero generators Gamesa G97 of 2 MWs of power and will have an average production of 30.000 megawatts per hour annually, covering the demand of around 13.000 Turkish homes, and avoiding the emission of 14.000 tons of CO2 annually.

The project is located in the town of Selcuk, province of Izmir, next to the Egeo’s coast, one the areas with major wind resources...

Subscribe to News