English

Gestamp Renewable Industries (GRI) continues its growth process in the renewable energy sector with the addition of the hybrid wind tower to its range of industrial products.

 

Category: 
Corporacion Gestamp
Gestamp Renewables
Gestamp Solar
Gestamp Wind
Gonvarri Steel Industries
Date: 
28/Feb/2013
Highlighted: 
Yes
Suscribe to our RSS RSS
English

(Madrid, June 14, 2012) Gestamp Wind has taken a strategic decision in the renewable energy sector worldwide with the construction of a Control Center that will allow us to manage and optimize the production in every installation.

 

 

Category: 
Corporacion Gestamp
Gestamp Renewables
Gestamp Wind
Date: 
14/Jun/2012
Highlighted: 
Yes
Suscribe to our RSS RSS
English
cabeco preto molino

(Madrid, May 8, 2012) Gestamp Wind, the wind energy division of Gestamp Renewables (Corporacion Gestamp) has started the commercial operation of the wind farms Cabeço Preto I and Cabeço Preto IV, in Rio Grande Norte, Brazil.

Both wind farms have a capacity of 20 Mw, summing a total of 40 Mw. Each wind farm is composed by 11 turbines. The total investment was of over 67 million Euros and the expected annual revenues are of 10 million Euros.

Category: 
Gestamp Wind
Corporacion Gestamp
Date: 
08/May/2012
Highlighted: 
Yes
Suscribe to our RSS RSS
English
Description: 

(Madrid, May 8, 2012) Gestamp Wind, the wind energy division of Gestamp Renewables (Corporacion Gestamp) has started the commercial operation of the wind farms Cabeço Preto I and Cabeço Preto IV, in Rio Grande Norte, Brazil.

Both wind farms have a capacity of 20 Mw, summing a total of 40 Mw. Each wind farm is composed by 11 turbines. The total investment was of over 67 million Euros and the expected annual revenues are of 10 million Euros.

Date: 
Tue, 05/08/2012
Youtube Video Id: 
Suscribe to our RSS RSS
English
Gestamp Wind Molino

 

Gestamp Wind receives in the United States $29 million out of the incentive funds for the renewable energy sector due to the investment made in the wind farm Petersburg (Nebraska)

 

 

 

Category: 
Corporacion Gestamp
Gestamp Wind
Date: 
02/Apr/2012
Highlighted: 
Yes
Suscribe to our RSS RSS

Hiasa

Description: 

Hiasa was established more than 40 years ago and acquired by Gonvarri Steel Services in 1972.

Hiasa focuses its activities in exploiting and transforming iron and steel products in order to obtain: strips, sheet metals, structural profiles, ribbed plates and panels for roofing and sidings, composite slabs, welded pipes, road safety barriers, acoustic barriers, noise free tunnel and wall coatings, plasma and laser cut parts, etc.

 

 

Certifications: 

 

  • UNE EN ISO 9001:2000
  • UNE EN ISO 14001



Address: 
Polígono Industrial de Cancienes
Location: 
Asturias
Country: 
Area: 
94.000 sqm
Tons per year: 
377.000
Start of operations: 
1972
GMap Latitude: 
43.5160
GMap Longitude: 
-5.8675
Highlighted: 
No

Multimedia

English
roth ro1

Gestamp Wind receives in the United States $32 million out of the incentive funds for the renewable energy sector due to the investment made in the wind farm Roth Rock (Maryland)

 

 

Category: 
Gestamp Wind
Gestamp Solar
Corporacion Gestamp
Date: 
16/Sep/2011
Highlighted: 
Yes
Suscribe to our RSS RSS
English
brazil

(Madrid, August 4, 2011) Gestamp Wind, wind energy division of Gestamp Renewables (Corporación Gestamp), has been given permission by the government energy agency to bid for 260 MW in the auction happening August 17, in Brazil.

Gestamp Wind, to date has nine wind farms (190 MW) in the north east of the country. Two of this wind farms are operating and the rest are under construction; with a total investment of 338 millions of Euros. Gestamp Wind has registered eleven new projects for the next Aneel auction, expected to be held August 17.

Category: 
Gestamp Wind
Corporacion Gestamp
Date: 
04/Aug/2011
Highlighted: 
Yes
Suscribe to our RSS RSS
English
Turgut Tepe

Gestamp Wind premieres in Turkey with the commissioning of its first wind farm in this country. A 24 megawatts project that involves a €35M investment and provides enough clean energy to power 30,000 homes annually.

Located near Bodrum town, the wind farm electricity production shall improve the positive effects on the environment, avoiding 47,554 tons per year of CO2 and providing a purifying effect equivalent to 2.38 million trees.

Category: 
Corporacion Gestamp
Gestamp Wind
Date: 
21/Jul/2011
Highlighted: 
Yes
Suscribe to our RSS RSS

Cabeço Preto I

Power: 
19,8 MW
Status: 
01 In operation 12

Cabeço Preto I is one of four projects carried out by Elawan that started operating by the end of 2012 in Brazil. It is located in João Câmara in the Rio Grande do Norte region. The turbines used for this project are the Vestas V82 with a 1,65MW capacity each one.

With this project, Elawan will have 113MW in operation by the end of 2012 with the goal of reaching a total power capacity of 500MW by 2015 in Brazil alone. 

Multimedia

Pages

Subscribe to Elawan RSS