{"id":14806,"date":"2025-05-06T00:02:47","date_gmt":"2025-05-05T22:02:47","guid":{"rendered":"https:\/\/www.elawan.com\/?post_type=instalacion&#038;p=14806"},"modified":"2025-05-27T19:35:30","modified_gmt":"2025-05-27T17:35:30","slug":"adares","status":"publish","type":"instalacion","link":"https:\/\/www.elawan.com\/en\/noticias\/instalacion\/adares\/","title":{"rendered":"Adares"},"content":{"rendered":"<p>Wind farm located in \u0130zmir Province (Turkey), featuring 5 turbines of 2.0 MW and expanded in 2021 with 3 turbines of 3.0 MW, reaching a total capacity of 19 MW and an estimated annual production of 58 GWh (2024).<\/p>\n","protected":false},"featured_media":13703,"template":"","tipo-instalacion":[31],"pais":[73],"class_list":["post-14806","instalacion","type-instalacion","status-publish","has-post-thumbnail","hentry","tipo-instalacion-wind-farm","pais-turkiye","description-off"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion\/14806","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion"}],"about":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/types\/instalacion"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media\/13703"}],"wp:attachment":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media?parent=14806"}],"wp:term":[{"taxonomy":"tipo-instalacion","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/tipo-instalacion?post=14806"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/pais?post=14806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}