{"id":15818,"date":"2025-05-28T18:18:46","date_gmt":"2025-05-28T16:18:46","guid":{"rendered":"https:\/\/www.elawan.com\/?post_type=instalacion&#038;p=15818"},"modified":"2025-05-29T19:22:14","modified_gmt":"2025-05-29T17:22:14","slug":"biescas-i","status":"publish","type":"instalacion","link":"https:\/\/www.elawan.com\/en\/noticias\/instalacion\/biescas-i\/","title":{"rendered":"Biescas I"},"content":{"rendered":"<p>Hydroelectric power plant with two Francis units and a capacity of 2.7 MW, located in the G\u00e1llego River basin (Arag\u00f3n, Spain), with an estimated annual production of 9.9 GWh (2024).<\/p>\n","protected":false},"featured_media":15095,"template":"","tipo-instalacion":[29],"pais":[64],"class_list":["post-15818","instalacion","type-instalacion","status-publish","has-post-thumbnail","hentry","tipo-instalacion-hydraulic-power-plant","pais-spain","description-off"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion\/15818","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion"}],"about":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/types\/instalacion"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media\/15095"}],"wp:attachment":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media?parent=15818"}],"wp:term":[{"taxonomy":"tipo-instalacion","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/tipo-instalacion?post=15818"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/pais?post=15818"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}