{"id":15830,"date":"2025-05-28T17:25:56","date_gmt":"2025-05-28T15:25:56","guid":{"rendered":"https:\/\/www.elawan.com\/?post_type=instalacion&#038;p=15830"},"modified":"2025-05-29T19:31:29","modified_gmt":"2025-05-29T17:31:29","slug":"aitona","status":"publish","type":"instalacion","link":"https:\/\/www.elawan.com\/en\/noticias\/instalacion\/aitona\/","title":{"rendered":"Aitona"},"content":{"rendered":"<p>Hydroelectric power plant with two Semi-Kaplan units and a capacity of 4.9 MW, located in the Segre River basin (Catalonia, Spain), with an estimated annual production of 6.4 GWh (2024).<\/p>\n","protected":false},"featured_media":15072,"template":"","tipo-instalacion":[29],"pais":[64],"class_list":["post-15830","instalacion","type-instalacion","status-publish","has-post-thumbnail","hentry","tipo-instalacion-hydraulic-power-plant","pais-spain","description-off"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion\/15830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion"}],"about":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/types\/instalacion"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media\/15072"}],"wp:attachment":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media?parent=15830"}],"wp:term":[{"taxonomy":"tipo-instalacion","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/tipo-instalacion?post=15830"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/pais?post=15830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}