{"id":16050,"date":"2025-05-28T17:00:53","date_gmt":"2025-05-28T15:00:53","guid":{"rendered":"https:\/\/www.elawan.com\/?post_type=instalacion&#038;p=16050"},"modified":"2025-05-30T12:04:16","modified_gmt":"2025-05-30T10:04:16","slug":"celis","status":"publish","type":"instalacion","link":"https:\/\/www.elawan.com\/en\/noticias\/instalacion\/celis\/","title":{"rendered":"Celis"},"content":{"rendered":"<p>Hydroelectric power plant with one Francis unit and a capacity of 6.3 MW, located in the Nansa River basin (Cantabria, Spain), with an estimated annual production of 27.6 GWh (2024).<\/p>\n","protected":false},"featured_media":14933,"template":"","tipo-instalacion":[29],"pais":[64],"class_list":["post-16050","instalacion","type-instalacion","status-publish","has-post-thumbnail","hentry","tipo-instalacion-hydraulic-power-plant","pais-spain","description-off"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion\/16050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/instalacion"}],"about":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/types\/instalacion"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media\/14933"}],"wp:attachment":[{"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/media?parent=16050"}],"wp:term":[{"taxonomy":"tipo-instalacion","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/tipo-instalacion?post=16050"},{"taxonomy":"pais","embeddable":true,"href":"https:\/\/www.elawan.com\/en\/wp-json\/wp\/v2\/pais?post=16050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}