Gravatá

Power: 
25 MW
Status: 
01 In operation 14

Gravatá is part of a larger project with a total production power capacity of 24,75MW. The turbines used for this project are the Vestas V82 with a 1,65MW capacity each one, and a 70 meter hub-height.  

 

Multimedia

English

When the idea of converting a shuttered paper mill in Berlin, New Hampshire, to a biomass power plant was first conceived by CS Operations Inc. in 2012, the developer had much more in mind than solely generating electricity from forest residue. Opportunity at the site was ripe, but added-value projects would come much further down the road, after several years of construction, operations and optimization.

Date: 
09/Jul/2019
Suscribe to our RSS RSS
Undefined

Gestamp Biomass participa en Bioenergía 4.0 , evento celebrado en Valladolid el 27 de Septiembre en el marco de Expobioenergía 2017.  Gestamp Biomass presentó a la audiencia el nuevo paradigma en el que  su filial GBS Energy se adentra poco a poco, dejando atrás un mundo de caos y complicaciones en la gestión de tareas y actividades.

Date: 
07/Feb/2018
Highlighted: 
Suscribe to our RSS RSS
English
  • In 2015, Gestamp Wind put in operation several wind power projects in Belgium, Brazil, Poland, and Turkey, thus adding 168 megawatts to its wind power portfolio.

 

  • Thanks to its 29 operating wind farms, Gestamp Wind helped lower C02 emissions by 504,923 tons.

 

  • Gestamp Wind is currently building projects in Belgium, Brazil, Mexico, and Turkey, surpassing one gigawatt of power in 2017.

 

Category: 
Corporacion Gestamp
Gestamp Renewables
Gestamp Wind
Date: 
06/Jun/2016
Highlighted: 
Yes
Suscribe to our RSS RSS

Adares

Power: 
10 MW
Status: 
01 In operation 25

Adares Wind Farm is located in Selcuk, in the Esmirna region, in the coast of the Aegean Sea. Thois is the second wind farm that the company has in Turkey.  

Adares has a power of 10MW, and it has 5 aero generators Gamesa G97 of 2 MWs of power and  an average production of 30.000 megawatts per hour annually, covering the demand of around 13.000 Turkish homes, avoiding the emission of 14.000 tons of CO2 annually.



 





Multimedia

English

Madrid, 14th of October of 2015. Gestamp Wind, the wind energy division from Gestamp Renewables, has opened the second wind farm in Adares, Turkey, with a power of 10 megawatts (MWs).

The wind farm has 5 aero generators Gamesa G97 of 2 MWs of power and will have an average production of 30.000 megawatts per hour annually, covering the demand of around 13.000 Turkish homes, and avoiding the emission of 14.000 tons of CO2 annually.

Category: 
Corporacion Gestamp
Gestamp Renewables
Gestamp Wind
Date: 
14/Oct/2015
Highlighted: 
Yes
Suscribe to our RSS RSS

Copperton

Power: 
102 MW
Status: 
02 Under construction 13

Copperton is the new wind farm with 102 MW located in the Northern Cape (South Africa). Copperton Wind Farm was submitted for Round 4 in August 2014, it has been selected Preferred Bibber under the REIPP Program (Renewable Energy Independent Power Producer Program). With Copperton Wind Farm, together with existing 75 MW wind project under operation since July 2014 (Noblesfontein Wind Farm), Elawan expands its presence in South Africa and positions itself as one of the main wind IPPs in this country.



Multimedia

Pages