Solar plant with a peak capacity of 60.3 MW, located in Bosque County (Texas, USA), operational since 2023, with an estimated annual production of 107 GWh (2024).

Solar plant with a peak capacity of 60.3 MW, located in Bosque County (Texas, USA), operational since 2023, with an estimated annual production of 107 GWh (2024).