Solar plant with a peak capacity of 86.6 MW, located in Hill County (Texas, USA), operational since 2023, with an estimated annual production of 153 GWh (2024).

Solar plant with a peak capacity of 86.6 MW, located in Hill County (Texas, USA), operational since 2023, with an estimated annual production of 153 GWh (2024).