Escatrón I-II-III
Solar complex with a peak capacity of 99 MW, composed of 32,400 modules of 610 Wp and 21,600 modules of 615 Wp, located in Puebla de Híjar (Teruel, Spain).
Solar complex with a peak capacity of 99 MW, composed of 32,400 modules of 610 Wp and 21,600 modules of 615 Wp, located in Puebla de Híjar (Teruel, Spain).
Wind-farm extension with six SG145-5 MW turbines and a total capacity of 5 MW, located in Valle de las Navas (Burgos, Spain).
Wind farm with three V162-6.4 MW turbines and a total capacity of 19.2 MW, located in Becerril de Campos (Palencia, Spain).
Wind farm with six SG145-5 MW turbines and a total capacity of 30 MW, located in Valle de las Navas (Burgos, Spain).
Wind farm with five V162-6.2 MW turbines and a total capacity of 31 MW, located in Becerril de Campos (Palencia, Spain).
Solar plant with a peak capacity of 49.97 MW, located in Ciudad Real (Spain), in operation since 2025.
Wind farm with 8 turbines of 5.5 MW, one turbine 1 of 5.6 MW, and a total capacity of 50 MW, located in Iniesta (Cuenca, Spain).
Solar plant with a peak capacity of 39.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 66 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 81 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production between 66 and 83 GWh (2024).