Skip to content
Elawan Energy
Elawan EnergyElawan Energy
  • Home
  • About us
  • Business
  • Projects
  • ESG
  • Talent
  • Communication
  • Contact
  • English
    • German
    • Spanish
    • French
    • Italian
    • Polish
    • Turkish
  • Home
  • About us
  • Business
  • Projects
  • ESG
  • Talent
  • Communication
  • Contact
  • English
    • German
    • Spanish
    • French
    • Italian
    • Polish
    • Turkish

Archives: Spain

You are here:
  1. Home
  2. Instalación

Escatrón I-II-III

By Laura Nieto28 de May de 2025

Solar complex with a peak capacity of 99 MW, composed of 32,400 modules of 610 Wp and 21,600 modules of 615 Wp, located in Puebla de Híjar (Teruel, Spain).

Miravete Ampliación

By Laura Nieto28 de May de 2025

Wind-farm extension with six SG145-5 MW turbines and a total capacity of 5 MW, located in Valle de las Navas (Burgos, Spain).

Monte Becerril 400

By Laura Nieto28 de May de 2025

Wind farm with three V162-6.4 MW turbines and a total capacity of 19.2 MW, located in Becerril de Campos (Palencia, Spain).

Miravete

By Laura Nieto28 de May de 2025

Wind farm with six SG145-5 MW turbines and a total capacity of 30 MW, located in Valle de las Navas (Burgos, Spain).

Salguero Fusión

By Laura Nieto28 de May de 2025

Wind farm with five V162-6.2 MW turbines and a total capacity of 31 MW, located in Becerril de Campos (Palencia, Spain).

Brazatortas 220kV

By Laura Nieto28 de May de 2025

Solar plant with a peak capacity of 49.97 MW, located in Ciudad Real (Spain), in operation since 2025.

Iniesta

By Laura Nieto28 de May de 2025

Wind farm with 8 turbines of 5.5 MW, one turbine 1 of 5.6 MW, and a total capacity of 50 MW, located in Iniesta (Cuenca, Spain).

Escuderos V

By Laura Nieto28 de May de 2025

Solar plant with a peak capacity of 39.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 66 GWh (2024).

Escuderos IV

By Laura Nieto28 de May de 2025

Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 81 GWh (2024).

Escuderos III

By Laura Nieto28 de May de 2025

Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production between 66 and 83 GWh (2024).

←123456→
© 2025 — ELAWAN ENERGY
  • Whistleblower Channel
  • Privacy Policy
  • Legal Notice & Terms of Use
  • Cookie Policy
Go to Top

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in .

Privacy summary

We use first- and third-party cookies for technical and analytical purposes, and to display multimedia content from external platforms. You can accept all cookies or configure your preferences. For more information, please see our Cookie Policy.

Strictly necessary cookies

These cookies are essential for the website to function properly. They include basic features such as security, network management, and accessibility. Without these cookies, the site cannot operate correctly.

Cookies included:

  • CONSENT (shared by various services)
  • Google reCAPTCHA (form security)
  • Site’s own session cookies

Si desactivas esta cookie no podremos guardar tus preferencias. Esto significa que cada vez que visites esta web tendrás que activar o desactivar las cookies de nuevo.

Statistics / Analytics

These cookies allow us to count visits and traffic sources to measure and improve our site’s performance. They help us understand which pages are most and least popular and how visitors navigate the site. All information collected by these cookies is aggregated and therefore anonymous.

Cookies included:

  • __utma, __utmb, __utmc, __utmz, __utmt (Google Analytics)
  • _ga, _gat, _gid (Google Analytics)

¡Por favor, activa primero las cookies estrictamente necesarias para que podamos guardar tus preferencias!

Functional / Multimedia

These cookies enhance the website’s functionality, such as displaying embedded videos. If not allowed, some content may not display correctly.

Cookies included:

  • VISITOR_INFO1_LIVE, YSC, PREF (YouTube)
  • Cookies required for YouTube or other third-party embeds

¡Por favor, activa primero las cookies estrictamente necesarias para que podamos guardar tus preferencias!