Escuderos II
Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 85 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 85 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Torrejoncillo del Rey (Cuenca, Spain), with an estimated annual production of 87 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Belinchón (Cuenca, Spain), with an estimated annual production of 87 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Belinchón (Cuenca, Spain), with an estimated annual production of 84 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Belinchón (Cuenca, Spain), with an estimated annual production of 80 GWh (2024).
Solar plant with a peak capacity of 49.99 MW, located in Noves (Toledo, Spain), with an estimated annual production of 81 GWh (2024).
Hydroelectric power plant with two Francis units and a capacity of 2.7 MW, located in the Gállego River basin (Aragón, Spain), with an estimated annual production of 9.9 GWh (2024).
Wind-farm extension with one turbine and a capacity of 2 MW, located in Becerril de Campos (Palencia, Spain), with an estimated annual production of 7 GWh (2024).
Hydroelectric power plant with two Semi-Kaplan units and a capacity of 4.9 MW, located in the Segre River basin (Catalonia, Spain), with an estimated annual production of 6.4 GWh (2024).
Hydroelectric power plant with two Francis units and a capacity of 24.7 MW, located in the Segre River basin (Catalonia, Spain), with an estimated annual production of 38.1 GWh (2024).