Baños

Hydroelectric power plant with one Pelton unit and a capacity of 5.5 MW, located in the Gállego River basin (Aragón, Spain), with an estimated annual production of 33.9 GWh (2024).

Becerril

Wind farm with three turbines and a capacity of 6 MW, located in Becerril de Campos (Palencia, Spain), with an estimated annual production of 16 GWh (2024).