Yahyali Solar II
Expansion of the Yahyalı PV plant with a peak capacity of 11 MW, located in Kayseri Province (Turkey).
Expansion of the Yahyalı PV plant with a peak capacity of 11 MW, located in Kayseri Province (Turkey).
Solar plant with a peak capacity of 60 MW, located in Kayseri Province (Turkey), operational since 2024. In 2025 it was expanded by an additional 11 MW.
Wind farm located in İzmir Province (Turkey), featuring 5 turbines of 2.0 MW and expanded in 2021 with 3 turbines of 3.0 MW, reaching a total capacity of 19 MW and an estimated annual production of 58 GWh (2024).
Wind farm with 12 turbines of 2.0 MW and a total capacity of 24 MW, located in Muğla Province (Turkey), with an estimated annual production of 66 GWh (2024).
Wind farm with 25 turbines of 3.3 MW and expanded in 2023 with 2 additional turbines of 4.5 MW, reaching a total capacity of 92.25 MW. It is located in Kayseri Province (Turkey) and has an estimated annual production of 250 GWh (2024).