Gravatá
Wind farm with 3 turbines of 1.65 MW and a total capacity of 4.95 MW, located in the state of Pernambuco (Brazil), with an estimated annual production of 13 GWh (2024).
Wind farm with 3 turbines of 1.65 MW and a total capacity of 4.95 MW, located in the state of Pernambuco (Brazil), with an estimated annual production of 13 GWh (2024).
Wind farm with 3 turbines of 1.65 MW and a total capacity of 4.95 MW, located in the state of Pernambuco (Brazil), with an estimated annual production of 12 GWh (2024).
Wind farm with 3 turbines of 1.65 MW and a total capacity of 4.95 MW, located in the state of Pernambuco (Brazil), with an estimated annual production of 9.7 GWh (2024).
Wind farm with 3 turbines of 1.65 MW and a total capacity of 4.95 MW, located in the state of Pernambuco (Brazil), with an estimated annual production of 9 GWh (2024).
Wind farm with 3 turbines of 2.4 MW and a total capacity of 7.2 MW, located in the state of Pernambuco (Brazil), with an estimated annual production of 14 GWh (2024).
Wind farm with 4 turbines of 4.0 MW and a total capacity of 16 MW, located in the state of Bahia (Brazil), with an estimated annual production of 75 GWh (2024).
Wind farm with 3 turbines of 3.2 MW and expanded in 2022 with 2 turbines of 3.6 MW, reaching a total capacity of 17.6 MW, located in the Wallonia region (Belgium), with an estimated annual production of 25 GWh (2024).
Wind farm with 7 turbines of 2.05 MW and a total capacity of 14.35 MW, located in the Wallonia region (Belgium), with an estimated annual production of 26 GWh (2024).
Wind farm with 10 turbines—9 at 2.4 MW and 1 at 3.4 MW—reaching a total capacity of 25 MW, located in the Wallonia region (Belgium), with an estimated annual production of 68 GWh (2024).
Wind farm with 7 turbines of 2.0 MW and a total capacity of 14 MW, located in the Wallonia region (Belgium), expanded in 2019, with an estimated annual production of 41 GWh (2024).